THE LATEST IN ROOFING
Replacing asphalt shingles is a critical home maintenance task to protect your property from leaks and weather damage. But how long should you expect the project to take?
In the Philippines, the time required to replace an asphalt shingle roof depends on various factors, including roof size, weather conditions, and labor efficiency. Below is a general estimate of the time frame and an analysis of the key factors that affect the roof replacement process, helping homeowners better understand the project timeline.
Average Timeframe for Roof Replacement
1. Small to Medium Roofs (100–200 sqm)
Approximately 1 to 3 days (with an experienced crew of 3 to 5 workers).
This includes tearing off the old shingles, inspecting the roof structure, and installing the new shingles.
2. Large Roofs (300+ sqm or complex designs)
Approximately 5 to 7 days (longer if structural repairs or underlayment issues are involved).
Larger or more complex roofs (such as those with multiple angles or skylights) will extend the project timeline.
Factors Affecting Duration
Weather Delays: Heavy rain or typhoons, which are common in the Philippines, can halt work. To minimize weather-related delays, contractors typically schedule roof replacements during the dry season (March–May or November–February).
Roof Complexity: Steep slopes, multiple angles, or skylights add time to the project. Additionally, valley flashing and edge sealing require precise workmanship, which extends labor hours.
Material Availability: If specialty shingles (e.g., impact-resistant or architectural types) need to be imported, there may be supply delays.
Additional Repairs: Rotted decking or damaged underlayment can add 1 to 2 extra days to the project.
Labor Efficiency: Filipino roofing crews typically work 8 to 10 hours per day. Lower bids may mean smaller teams, which can prolong the project.
Tips for Faster Completion
Plan Ahead: Schedule projects during dry months (November–April).
Verify Material Stocks: Confirm shingle availability before starting.
Clear the Worksite: Move vehicles, patio furniture, and outdoor items to give crews unobstructed access.
Hire Licensed Contractors: Experienced crews minimize errors.
Secure Permits Early: Local barangay permits can take 1–3 days to process.
Opt for simpler designs if time is a constraint.
Conclusion
The time required for asphalt shingle roof replacement in the Philippines varies depending on roof size, design complexity, and other external factors. For a more accurate estimate, homeowners are encouraged to contact local roofing contractors for an on-site assessment. Many roofing contractors in the Philippines (e.g., RoofX, Duraville Construction) offer free quotations to help clients make informed decisions.
REQUEST A QUOTE
Copyright © Hangzhou Singer Building Materials Co., Ltd. All Rights Reserved |
Sitemap
| Powered by
SEOKeywords:Roof Tile ManufacturerRoof Shingle ManufacturerAsphalt Shingle SupplierRain Gutter CompanyShingle Roofing CompanyWaterproof Tape For RoofPressed Steel Roofing TilesRain Gutter SystemGray Asphalt ShingleStone Coated Metal Roofing Manufacturer